{"id":5517,"date":"2026-05-11T14:47:55","date_gmt":"2026-05-11T11:47:55","guid":{"rendered":"https:\/\/ahuza.co.il\/tama-38-haifa-2026-guide\/"},"modified":"2026-07-31T14:45:47","modified_gmt":"2026-07-31T11:45:47","slug":"tama-38-haifa-2026-guide","status":"publish","type":"post","link":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/","title":{"rendered":"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines"},"content":{"rendered":"<p><!-- TL;DR, atomic answer at top --><\/p>\n<div class=\"sgo-tldr\" style=\"background:#FCF1E0;border-left:4px solid #EFAA4B;padding:18px 22px;margin:0 0 26px;border-radius:8px;direction:ltr;text-align:left\">\n<p style=\"margin:0 0 8px;font-weight:700;color:#000\">TAMA 38 Haifa, a direct answer<\/p>\n<p style=\"margin:0;color:#222;line-height:1.7\">TAMA 38 in Haifa is a national outline plan for reinforcing buildings against earthquakes, which in practice operates alongside the Haifa local master plan HP\/2030 and the HP\/2666 updates. As of mid-2026 the original TAMA 38 is no longer a live track: the acceptance of new applications under it ended in October 2023, and only isolated buildings are still advancing under permits approved earlier. In its place, two current urban renewal tracks operate in Haifa, the Shaked Alternative (single-building renewal, a single building) and evacuation-construction (Pinui-Binui, area-wide renewal, several buildings), in the Hadar, Carmel, Neve Sha&#8217;anan and Bat Galim neighborhoods, and they grant significant building rights to residents and developers. A resident in a suitable building can obtain a full upgrade of the apartment, a protected room (mamad), parking and an elevator at no monetary cost, subject to a lawful majority and the developer&#8217;s economic feasibility check.<\/p>\n<\/div>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;font-size:17px;color:#1a1a1a\">TAMA 38 in Haifa is one of the oldest and most influential plans in the city&#8217;s real estate market, and it is the first port of call for apartment owners seeking to upgrade old housing and for developers seeking building rights. Despite repeated announcements of its imminent end, hundreds of buildings in Haifa are currently being advanced through the Shaked Alternative and evacuation-construction tracks, and the city continues to approve permits under it alongside the <a href=\"https:\/\/ahuza.co.il\/hithadshut-iruit-haifa-2026\/\">urban renewal plans in Haifa<\/a>. In this guide we analyze the 2026 situation: where the regulation has pointed, which neighborhoods are still worth TAMA 38, how to tell a serious developer from one who drags the process out, and what a Haifa resident needs to check before signing.<\/p>\n<p><!-- TOC --><\/p>\n<nav class=\"sgo-toc\" style=\"background:#fff;border:1px solid #e6e0d4;padding:20px 26px;margin:28px 0;border-radius:10px;direction:ltr;text-align:left;box-shadow:0 1px 3px rgba(0,0,0,.04)\">\n<h2 style=\"margin:0 0 14px;font-size:18px;color:#000;font-weight:700\">Table of Contents<\/h2>\n<ol style=\"margin:0;padding-left:22px;line-height:2;color:#1a1a1a\">\n<li>What TAMA 38 is and the tracks that replaced it in 2026<\/li>\n<li>TAMA 38 in Haifa 2026: where the market is heading<\/li>\n<li>Haifa neighborhoods where TAMA 38 is still relevant<\/li>\n<li>TAMA 38 vs evacuation-construction in Haifa, which is more worthwhile<\/li>\n<li>Resident rights in TAMA 38 Haifa<\/li>\n<li>Costs, taxes and benefits in TAMA 38<\/li>\n<li>How to choose a TAMA 38 developer in Haifa, 7 essential checks<\/li>\n<li>Realistic timelines of a TAMA 38 project<\/li>\n<li>Common resident mistakes, and how to avoid them<\/li>\n<li>Frequently asked questions<\/li>\n<\/ol>\n<\/nav>\n<h2 id=\"mahze\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">What TAMA 38 is and the tracks that replaced it in 2026<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">National Outline Plan 38, approved in 2005, was designed to reinforce buildings built before 1980 against earthquakes. The original plan closed for new applications in October 2023, and today urban renewal in Haifa rests on two current tracks, which differ greatly in planning, economic and experiential terms for the resident.<\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\"><strong>The Shaked Alternative (single-building renewal, a single building):<\/strong> The track that in practice replaced TAMA 38 for a single building. A detailed plan is advanced in the local committee for one building, the building is demolished and rebuilt, and the residents receive a brand-new apartment. The track grants expanded building rights (up to about 400% in suitable cases), and replaces what used to be called TAMA 38\/2 for a single building.<\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\"><strong>Evacuation-construction (area-wide renewal, several buildings):<\/strong> The track for a compound of several buildings together (usually a minimum of about 24 housing units). The buildings are demolished, the residents move to alternative housing at the developer&#8217;s expense for 24\u201336 months, and receive a new, larger apartment with a protected room, parking and storage. This is the leading track in Haifa for whole compounds in the veteran neighborhoods.<\/p>\n<h2 id=\"matzav-2026\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">TAMA 38 in Haifa 2026: where the market is heading<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">The national regulatory trend is clear: TAMA 38 expired in October 2023, and the centre of gravity moved to single-building renewal (the Shaked Alternative) and to area-wide evacuation-construction. In Haifa, unlike Tel Aviv, that shift is advancing slowly. As of mid-2026 no new plans are approved under TAMA 38\/2, and the local committee mainly handles applications filed while the plan was still in force. A single building starting out today is advanced through a detailed plan at the local committee, not under 38\/2.<\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">The municipality continues to issue permits under TAMA 38 mainly in single buildings that are not within an evacuation-construction compound. The meaning for the resident: if your building is not within the area of the HP\/2666 plan or an area plan of HP\/2030, TAMA 38 is still the tool available to you.<\/p>\n<h2 id=\"shchunot\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Haifa neighborhoods where TAMA 38 is still relevant<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">TAMA 38 is not economically worthwhile everywhere in Haifa. Its viability is determined by the apartment value after renewal, the construction cost per sqm, and the number of units that can be added. Below is a mapping of the active areas as of 2026:<\/p>\n<table style=\"width:100%;border-collapse:collapse;direction:ltr;text-align:left;margin:18px 0\">\n<thead>\n<tr style=\"background:#000;color:#fff\">\n<th style=\"padding:12px;border:1px solid #333;color:#fff;\">Neighborhood<\/th>\n<th style=\"padding:12px;border:1px solid #333;color:#fff;\">Main track<\/th>\n<th style=\"padding:12px;border:1px solid #333;color:#fff;\">Apartment value after (average)<\/th>\n<th style=\"padding:12px;border:1px solid #333;color:#fff;\">Feasibility level 2026<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Upper Hadar<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Evacuation-construction<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa1.7\u2013\u20aa2.2 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#1d7d3a;font-weight:700\">High<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Neve Sha&#8217;anan<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Mainly evacuation-construction<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa1.9\u2013\u20aa2.5 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#1d7d3a;font-weight:700\">High<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Central Carmel<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Shaked Alternative<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa2.4\u2013\u20aa3.1 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#1d7d3a;font-weight:700\">High<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Kiryat Eliezer<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Evacuation-construction (not TAMA 38)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa1.6\u2013\u20aa2.0 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#a36100;font-weight:700\">TAMA 38 blocked<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Bat Galim<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Combined (Shaked Alternative + evacuation-construction)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa1.5\u2013\u20aa1.9 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#1d7d3a;font-weight:700\">Medium-high<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Ramat Shaul<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Shaked Alternative (single building)<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa2.2\u2013\u20aa2.8 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#1d7d3a;font-weight:700\">High<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #ddd\">Romema<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">Evacuation-construction<\/td>\n<td style=\"padding:10px;border:1px solid #ddd\">\u20aa1.7\u2013\u20aa2.1 million<\/td>\n<td style=\"padding:10px;border:1px solid #ddd;color:#a36100;font-weight:700\">Medium<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">For a deeper mapping by neighborhood, see the <a href=\"https:\/\/ahuza.co.il\/en\/haifa-investment-neighborhoods\/\">complete guide to investment neighborhoods in Haifa<\/a>, and for specific evacuation-construction targets in Kiryat Eliezer see the <a href=\"https:\/\/ahuza.co.il\/en\/pinui-binui-haifa-2026-guide\/\">guide to evacuation-construction in Haifa<\/a>.<\/p>\n<h2 id=\"vs-pinui\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">TAMA 38 vs evacuation-construction in Haifa, which is more worthwhile<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">The most common question we get from Haifa apartment owners: &#8220;We already signed a TAMA 38 agreement back in 2019 and nothing is happening. Should we switch to evacuation-construction?&#8221; The answer depends on four variables:<\/p>\n<ul style=\"direction:ltr;text-align:left;line-height:2;color:#1a1a1a;padding-left:22px\">\n<li><strong>Building size:<\/strong> Fewer than 12 apartments \u2192 TAMA 38 is almost always preferable. 24 apartments and up \u2192 check area-wide evacuation-construction.<\/li>\n<li><strong>Land value:<\/strong> In Hadar and Bat Galim, where land value is relatively low, evacuation-construction requires a compound of 100+ units to be economically viable. TAMA 38 solves the problem at the single-building level.<\/li>\n<li><strong>Time:<\/strong> TAMA 38 today is carried out in 3\u20134 years from signing to handover. Evacuation-construction in Haifa, 7\u201311 years on average, according to Urban Renewal Authority data.<\/li>\n<li><strong>Size of the apartment received:<\/strong> In evacuation-construction the new apartment is usually 3\u20135 sqm larger. In the demolition-and-rebuild track for a single building the addition is fixed at about 25 sqm.<\/li>\n<\/ul>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">For a broad review of the advantages and tax costs when carrying out evacuation-construction, read the <a href=\"https:\/\/ahuza.co.il\/en\/purchase-betterment-tax-haifa-real-estate-2026\/\">guide to purchase tax and betterment tax in Haifa real estate<\/a>.<\/p>\n<h2 id=\"zchuyot\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Resident rights in TAMA 38 Haifa<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">TAMA 38 grants the existing resident in the building a basket of rights that the developer cannot negotiate down, and to which one can only add. These are the mandatory rights:<\/p>\n<ul style=\"direction:ltr;text-align:left;line-height:2;color:#1a1a1a;padding-left:22px\">\n<li>Expansion of the apartment by 25 sqm (protected room + balcony + interior improvement), free of charge.<\/li>\n<li>At least one parking space per apartment (usually underground).<\/li>\n<li>An elevator in the building, mandatory even in a building that had no elevators.<\/li>\n<li>Renovation of facades, roof, stairwell and shared systems.<\/li>\n<li>In the demolition-and-rebuild track: rent payments + moving expenses + performance guarantees + Sale Law guarantee.<\/li>\n<li>A comprehensive building insurance policy for the execution period.<\/li>\n<\/ul>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">For orderly legal information on resident rights in the urban renewal process, see the review at the <a href=\"https:\/\/www.kolzchut.org.il\/he\/%D7%AA%D7%9E%22%D7%90_38\" rel=\"nofollow\" target=\"_blank\">&#8220;Kol Zchut&#8221; portal, TAMA 38<\/a>. Background on the planning structure can be found in the <a href=\"https:\/\/he.wikipedia.org\/wiki\/%D7%AA%D7%9E%22%D7%90_38\" rel=\"nofollow\" target=\"_blank\">Wikipedia entry, TAMA 38<\/a>.<\/p>\n<h2 id=\"alut\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Costs, taxes and benefits in TAMA 38<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">TAMA 38 Haifa is among the cheapest tracks for the resident in terms of tax liability, if the agreement is drawn up correctly. The resident does not pay purchase tax on the expanded apartment, and is not liable for betterment tax on the old apartment, subject to the terms of section 49LB of the Real Estate Taxation Law. That said, purchase tax does apply in two scenarios: buying rights from another resident during the project, or buying additional square meters beyond the standard 25.<\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">The developer, for its part, bears the costs of demolition (in the demolition-and-rebuild track), alternative rent, insurance, purchase tax on the land it acquires from the residents in exchange for the new apartments, and VAT on apartments it sells on the open market. In Haifa, the average construction cost in 2026 stands at \u20aa9,800\u2013\u20aa11,500 per gross sqm, according to the CBS construction-sector indices. The official data can be cross-checked against the <a href=\"https:\/\/www.cbs.gov.il\/he\/subjects\/Pages\/%D7%93%D7%99%D7%95%D7%A8.aspx\" rel=\"nofollow\" target=\"_blank\">CBS, housing topics<\/a> and the Tax Authority&#8217;s transaction database at the <a href=\"https:\/\/www.nadlan.gov.il\/\" rel=\"nofollow\" target=\"_blank\">Tax Authority real estate website<\/a>.<\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">Anyone who needs full financial guidance, a mortgage in the interim stage, bridging or an interim loan, can consult the <a href=\"https:\/\/ahuza.co.il\/en\/financing-real-estate-investments-haifa-2026\/\">financing guide for real estate investment in Haifa<\/a>.<\/p>\n<h2 id=\"yazam\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">How to choose a TAMA 38 developer in Haifa, 7 essential checks<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">Choosing the developer is the single most critical step in any project. A strong developer completes the project; a weak developer leaves the residents for years with no handover and no apartment. The following seven checks filter out 80% of problems even before signing:<\/p>\n<ol style=\"direction:ltr;text-align:left;line-height:2;color:#1a1a1a;padding-left:22px\">\n<li><strong>One construction site ready for handover today:<\/strong> Ask to see an advanced TAMA 38 project by the same developer, preferably in Haifa. If there is none, a red flag.<\/li>\n<li><strong>Proven equity:<\/strong> A genuine developer is required to present a performance guarantee from a financing bank. Do not accept a &#8220;letter of intent.&#8221;<\/li>\n<li><strong>A contract with a transparent formula:<\/strong> Every addition of rights should appear as a percentage and not as a fixed sum. Years of inflation will erode a fixed amount.<\/li>\n<li><strong>A representation lawyer:<\/strong> The representation&#8217;s lawyer must not be recommended by the developer. They must be exclusive to the residents, with their fee paid by the developer, a standard method.<\/li>\n<li><strong>Timelines in the contract:<\/strong> Month of permit receipt, month of execution start, month of handover, all with agreed compensation.<\/li>\n<li><strong>A visit to a work site in Haifa:<\/strong> Talk to residents living in a previous project by the same developer. All the other checks are worth less than a 30-minute direct conversation.<\/li>\n<li><strong>Planning feasibility at the municipality:<\/strong> Ask for an initial in-principle approval from the local committee. Without it, the agreement is based on hopes.<\/li>\n<\/ol>\n<h2 id=\"luach\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Realistic timelines of a TAMA 38 project in Haifa<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">A Haifa resident entering TAMA 38 in 2026 should plan their life around the following axes. These are the real times, not the times that appear in the developer&#8217;s brochure:<\/p>\n<ul style=\"direction:ltr;text-align:left;line-height:2;color:#1a1a1a;padding-left:22px\">\n<li><strong>0\u20134 months:<\/strong> Signing a consent document, appointing a residents&#8217; lawyer, signing a framework agreement.<\/li>\n<li><strong>4\u201314 months:<\/strong> Submitting a permit plan, objections, approval by the Haifa local committee.<\/li>\n<li><strong>14\u201322 months:<\/strong> Plan amendments, final building permit, securing bank financing, Sale Law contract.<\/li>\n<li><strong>22\u201324 months:<\/strong> Vacating apartments (in the demolition-rebuild track), demolition.<\/li>\n<li><strong>24\u201348 months:<\/strong> Execution, shell, finishes, systems, connections.<\/li>\n<li><strong>48\u201352 months:<\/strong> Handover to residents, condominium registration, occupancy.<\/li>\n<\/ul>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">Anyone told &#8220;the project will finish in two years&#8221; should ask how that is possible when the permit itself takes 18\u201322 months at the municipality. In Haifa, in recent years, TAMA 38 projects that were fully completed required 46\u201358 months on average from the first signing.<\/p>\n<h2 id=\"taut\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Common resident mistakes, and how to avoid them<\/h2>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a\">The following five mistakes appeared again and again in TAMA 38 projects in Haifa over the past three years, and all of them are preventable:<\/p>\n<ul style=\"direction:ltr;text-align:left;line-height:2;color:#1a1a1a;padding-left:22px\">\n<li><strong>Signing before there is 80% consent:<\/strong> The TAMA 38 law requires a majority of 80% of residents (66% in the reinforcement track under the new framework). Without such a majority, the agreement is not enforceable.<\/li>\n<li><strong>Relying on the developer&#8217;s presentation without checking documents:<\/strong> Anything not in the contract does not exist. A promise about a kitchen, air conditioners or storage must appear in writing.<\/li>\n<li><strong>Choosing a lawyer recommended by the developer:<\/strong> Mistake number one. The residents&#8217; lawyer must be completely independent of the developer.<\/li>\n<li><strong>Not appointing an active representation:<\/strong> 3\u20135 residents who lead the contact with the developer, document decisions, and update the building. Without them, communication dissolves.<\/li>\n<li><strong>Waiving guarantees:<\/strong> You must not agree to the start of execution without a full Sale Law guarantee. A resident in Haifa who waives a guarantee is exposed to the risk of losing the apartment if the developer goes bankrupt.<\/li>\n<\/ul>\n<p><!-- CTA --><\/p>\n<div class=\"sgo-cta\" style=\"background:#000 !important;color:#fff !important;padding:32px 28px;margin:36px 0;border-radius:12px;direction:ltr;text-align:left\">\n<h3 style=\"margin:0 0 10px;color:#EFAA4B !important;font-size:22px;font-weight:700\">Considering TAMA 38 in Haifa?<\/h3>\n<p style=\"margin:0 0 18px;color:#fff !important;line-height:1.7;font-size:16px\">The Ahuza Real Estate team accompanies residents and developers in Haifa through all stages of the project, from an initial feasibility check to the handover of the keys. We would be glad to give you a first consultation call with no obligation.<\/p>\n<p><a href=\"#footer\" style=\"display:inline-block;background:#EFAA4B !important;color:#000 !important;padding:14px 32px;border-radius:8px;text-decoration:none;font-weight:700;font-size:16px\">Get professional advice<\/a>\n<\/div>\n<p><!-- FAQ --><\/p>\n<h2 id=\"faq\" style=\"direction:ltr;text-align:left;color:#000;font-size:24px;margin:34px 0 12px\">Frequently asked questions about TAMA 38 Haifa<\/h2>\n<div class=\"sgo-faq sgo-faq-accordion\" style=\"direction:ltr;text-align:left\">\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">Is TAMA 38 in Haifa still relevant in 2026?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">Yes. Despite the decline in volume, TAMA 38 is active in Haifa in 2026, mainly in the Hadar, Neve Sha&#8217;anan, Central Carmel, Ramat Shaul and Bat Galim neighborhoods. In Kiryat Eliezer and large parts of Romema the plan can no longer be implemented due to area plans.<\/p>\n<\/details>\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">What is the difference between the Shaked Alternative and evacuation-construction in Haifa?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">The Shaked Alternative (single-building renewal) applies to a single building, through a detailed plan in the local committee, and it is the track that in practice replaced TAMA 38 for a single building. Evacuation-construction (area-wide renewal) applies to a compound of several buildings together (usually a minimum of about 24 units). In both tracks the building is demolished and rebuilt and the residents receive a new apartment. In Haifa, most of the large projects advance as evacuation-construction, and single buildings are advanced through the Shaked Alternative.<\/p>\n<\/details>\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">How long does a TAMA 38 project in Haifa take?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">An average TAMA 38 project in Haifa lasts 46\u201358 months from the signing of the first agreement until the handover of the keys. The main cause of delay is the permit process at the municipality, which takes 18\u201322 months. A resident promised less than three years is receiving an unrealistic promise.<\/p>\n<\/details>\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">Does a resident pay purchase tax on a TAMA 38 apartment?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">No, subject to section 49LB of the Real Estate Taxation Law. A veteran resident who receives an expanded apartment in the strengthening-and-addition track, or a new apartment in the demolition-and-rebuild track, is exempt from purchase tax on the addition and from any betterment tax on the old apartment. The charge arises only if additional square meters beyond the standard 25 are purchased.<\/p>\n<\/details>\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">What should you check before signing a TAMA 38 agreement in Haifa?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">Five essential checks: planning feasibility at the local committee, the developer&#8217;s handed-over projects, a Sale Law guarantee and performance guarantee, an independent residents&#8217; lawyer (not recommended by the developer), and binding timelines with agreed compensation. See the seven detailed checks in the &#8220;How to choose a developer&#8221; section of this article.<\/p>\n<\/details>\n<details style=\"border:1px solid #e6e0d4;border-radius:8px;margin:10px 0;padding:14px 18px;background:#fff\">\n<summary style=\"font-weight:700;cursor:pointer;color:#000;font-size:17px\">TAMA 38 or evacuation-construction in Haifa, which is better?<\/summary>\n<p style=\"margin:10px 0 0;line-height:1.85;color:#1a1a1a\">The single-building track (the Shaked Alternative, single-building renewal) is preferable for single buildings of fewer than 12 apartments, or for locations where land value is below \u20aa7,000 per gross sqm. Evacuation-construction is preferable for compounds of 24 apartments and up, where several buildings can be combined. The timelines of evacuation-construction in Haifa today are 7\u201311 years, compared with 4\u20135 years in the single-building track.<\/p>\n<\/details>\n<\/div>\n<p><!-- Closing paragraph --><\/p>\n<p style=\"direction:ltr;text-align:left;line-height:1.85;color:#1a1a1a;margin-top:30px;font-size:17px\">TAMA 38 Haifa is neither yesterday&#8217;s plan nor tomorrow&#8217;s solution, but rather the relevant tool for a Haifa resident living in a single building that is not within the bounds of an evacuation-construction compound. As of mid-2026, it still enables a full upgrade of the apartment, parking, a protected room and an elevator, at zero cost to the resident and subject to choosing an experienced developer and a proper planning check. <strong>Last updated: May 2026.<\/strong><\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is TAMA 38 in Haifa still relevant in 2026?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Despite the decline in volume, TAMA 38 is active in Haifa in 2026, mainly in the Hadar, Neve Sha'anan, Central Carmel, Ramat Shaul and Bat Galim neighborhoods. In Kiryat Eliezer and large parts of Romema the plan can no longer be implemented due to area plans.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between the Shaked Alternative and evacuation-construction in Haifa?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Shaked Alternative (single-building renewal) applies to a single building through a detailed plan in the local committee, and it replaced TAMA 38 for a single building. Evacuation-construction (area-wide renewal) applies to a compound of several buildings (usually a minimum of about 24 units). In both tracks the building is demolished and rebuilt and the residents receive a new apartment. In Haifa, most large projects advance as evacuation-construction, and single buildings through the Shaked Alternative.\"}},{\"@type\":\"Question\",\"name\":\"How long does a TAMA 38 project in Haifa take?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"An average TAMA 38 project in Haifa lasts 46-58 months from the signing of the first agreement until the handover of the keys. The main cause of delay is the permit process at the municipality, which takes 18-22 months.\"}},{\"@type\":\"Question\",\"name\":\"Does a resident pay purchase tax on a TAMA 38 apartment?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No, subject to section 49LB of the Real Estate Taxation Law. A veteran resident who receives an expanded apartment in the strengthening-and-addition track, or a new apartment in the demolition-and-rebuild track, is exempt from purchase tax on the addition and from any betterment tax on the old apartment. The charge arises only if additional square meters beyond the standard 25 are purchased.\"}},{\"@type\":\"Question\",\"name\":\"What should you check before signing a TAMA 38 agreement in Haifa?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Five essential checks: planning feasibility at the local committee, the developer's handed-over projects, a Sale Law guarantee and performance guarantee, an independent residents' lawyer, and binding timelines with agreed compensation.\"}},{\"@type\":\"Question\",\"name\":\"TAMA 38 or evacuation-construction in Haifa, which is better?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The single-building track (the Shaked Alternative, single-building renewal) is preferable for single buildings of fewer than 12 apartments, or for locations where land value is low. Evacuation-construction is preferable for compounds of 24 apartments and up. The timelines of evacuation-construction in Haifa are 7-11 years, compared with 4-5 years in the single-building track.\"}}]}<\/script><br \/>\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"Article\",\"headline\":\"TAMA 38 Haifa 2026, The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines\",\"inLanguage\":\"en-US\",\"datePublished\":\"2026-05-11T14:46:27+03:00\",\"dateModified\":\"2026-05-11T14:46:27+03:00\",\"author\":{\"@type\":\"Organization\",\"name\":\"Ahuza Real Estate\",\"url\":\"https:\/\/ahuza.co.il\/\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"Ahuza Real Estate\",\"url\":\"https:\/\/ahuza.co.il\/\"},\"image\":\"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026.png\",\"about\":\"TAMA 38 Haifa\"}<\/script><\/p>\n<p class=\"ahuza-cluster-link\">Interested in urban renewal? <a href=\"https:\/\/ahuza.co.il\/en\/urban-renewal\/\">Urban renewal projects<\/a> with Ahuza Real Estate, proven experience in Haifa and the north.<\/p>\n<p><!--rc-skip--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TAMA 38 Haifa 2026: the complete guide for residents and investors \u2014 differences between strengthening-and-addition and demolition-and-rebuild, relevant neighborhoods, TAMA vs evacuation-construction, resident rights, costs, timelines and mistakes to avoid.<\/p>\n","protected":false},"author":1,"featured_media":4312,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.9 (Yoast SEO v28.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>TAMA 38 Haifa 2026 | The Complete Resident&#039;s Guide<\/title>\n<meta name=\"description\" content=\"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines\" \/>\n<meta property=\"og:description\" content=\"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"Ahuza\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-11T11:47:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-31T11:45:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026-1024x585.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"585\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/#\\\/schema\\\/person\\\/58b028a849147e544c9be4b22602a5da\"},\"headline\":\"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines\",\"datePublished\":\"2026-05-11T11:47:55+00:00\",\"dateModified\":\"2026-07-31T11:45:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/\"},\"wordCount\":2433,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ahuza.co.il\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/tama-38-haifa-2026.png\",\"articleSection\":[\"\u05dc\u05dc\u05d0 \u05e7\u05d8\u05d2\u05d5\u05e8\u05d9\u05d4\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/\",\"url\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/\",\"name\":\"TAMA 38 Haifa 2026 | The Complete Resident's Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ahuza.co.il\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/tama-38-haifa-2026.png\",\"datePublished\":\"2026-05-11T11:47:55+00:00\",\"dateModified\":\"2026-07-31T11:45:47+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/#\\\/schema\\\/person\\\/58b028a849147e544c9be4b22602a5da\"},\"description\":\"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ahuza.co.il\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/tama-38-haifa-2026.png\",\"contentUrl\":\"https:\\\/\\\/ahuza.co.il\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/tama-38-haifa-2026.png\",\"width\":1792,\"height\":1024,\"caption\":\"\u05ea\u05de\u05d0 38 \u05d7\u05d9\u05e4\u05d4 2026, \u05de\u05d1\u05e0\u05d4 \u05de\u05d2\u05d5\u05e8\u05d9\u05dd \u05de\u05d7\u05d5\u05d6\u05e7 \u05d1\u05e8\u05d7\u05d5\u05d1 \u05d4\u05db\u05e8\u05de\u05dc \u05d1\u05e9\u05e2\u05ea \u05d4\u05d6\u05d4\u05d1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/tama-38-haifa-2026-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea\",\"item\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/\",\"name\":\"Ahuza\",\"description\":\"\u05d4\u05ea\u05d7\u05d3\u05e9\u05d5\u05ea \u05e2\u05d9\u05e8\u05d5\u05e0\u05d9\u05ea | \u05d3\u05d9\u05e8\u05d5\u05ea \u05dc\u05d4\u05e9\u05e7\u05e2\u05d4 \u05d1\u05d7\u05d9\u05e4\u05d4 | \u05e7\u05e8\u05e7\u05e2\u05d5\u05ea \u05dc\u05d4\u05e9\u05e7\u05e2\u05d4 | \u05e0\u05d3\u05dc&quot;\u05df \u05d1\u05d9\u05e0\u05dc\u05d0\u05d5\u05de\u05d9 | \u05d4\u05e9\u05e7\u05e2\u05d5\u05ea \u05e0\u05d3\u05dc&quot;\u05df | \u05de\u05d9\u05de\u05d5\u05df \u05dc\u05d4\u05e9\u05e7\u05e2\u05d5\u05ea \u05e0\u05d3\u05dc&quot;\u05df\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ahuza.co.il\\\/en\\\/#\\\/schema\\\/person\\\/58b028a849147e544c9be4b22602a5da\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/ahuza.sgo.co.il\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"TAMA 38 Haifa 2026 | The Complete Resident's Guide","description":"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/","og_locale":"en_US","og_type":"article","og_title":"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines","og_description":"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.","og_url":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/","og_site_name":"Ahuza","article_published_time":"2026-05-11T11:47:55+00:00","article_modified_time":"2026-07-31T11:45:47+00:00","og_image":[{"width":1024,"height":585,"url":"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026-1024x585.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#article","isPartOf":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/"},"author":{"name":"admin","@id":"https:\/\/ahuza.co.il\/en\/#\/schema\/person\/58b028a849147e544c9be4b22602a5da"},"headline":"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines","datePublished":"2026-05-11T11:47:55+00:00","dateModified":"2026-07-31T11:45:47+00:00","mainEntityOfPage":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/"},"wordCount":2433,"commentCount":0,"image":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026.png","articleSection":["\u05dc\u05dc\u05d0 \u05e7\u05d8\u05d2\u05d5\u05e8\u05d9\u05d4"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/","url":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/","name":"TAMA 38 Haifa 2026 | The Complete Resident's Guide","isPartOf":{"@id":"https:\/\/ahuza.co.il\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#primaryimage"},"image":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026.png","datePublished":"2026-05-11T11:47:55+00:00","dateModified":"2026-07-31T11:45:47+00:00","author":{"@id":"https:\/\/ahuza.co.il\/en\/#\/schema\/person\/58b028a849147e544c9be4b22602a5da"},"description":"TAMA 38 Haifa 2026: the programme ended in October 2023. The live tracks now are the Shaked Alternative and area-wide Pinui Binui. Resident rights inside.","breadcrumb":{"@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#primaryimage","url":"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026.png","contentUrl":"https:\/\/ahuza.co.il\/wp-content\/uploads\/2026\/05\/tama-38-haifa-2026.png","width":1792,"height":1024,"caption":"\u05ea\u05de\u05d0 38 \u05d7\u05d9\u05e4\u05d4 2026, \u05de\u05d1\u05e0\u05d4 \u05de\u05d2\u05d5\u05e8\u05d9\u05dd \u05de\u05d7\u05d5\u05d6\u05e7 \u05d1\u05e8\u05d7\u05d5\u05d1 \u05d4\u05db\u05e8\u05de\u05dc \u05d1\u05e9\u05e2\u05ea \u05d4\u05d6\u05d4\u05d1"},{"@type":"BreadcrumbList","@id":"https:\/\/ahuza.co.il\/en\/tama-38-haifa-2026-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea","item":"https:\/\/ahuza.co.il\/en\/home\/"},{"@type":"ListItem","position":2,"name":"TAMA 38 Haifa 2026 \u2014 The Complete Guide to the Differences from Evacuation-Construction, Neighborhoods and Timelines"}]},{"@type":"WebSite","@id":"https:\/\/ahuza.co.il\/en\/#website","url":"https:\/\/ahuza.co.il\/en\/","name":"Ahuza","description":"\u05d4\u05ea\u05d7\u05d3\u05e9\u05d5\u05ea \u05e2\u05d9\u05e8\u05d5\u05e0\u05d9\u05ea | \u05d3\u05d9\u05e8\u05d5\u05ea \u05dc\u05d4\u05e9\u05e7\u05e2\u05d4 \u05d1\u05d7\u05d9\u05e4\u05d4 | \u05e7\u05e8\u05e7\u05e2\u05d5\u05ea \u05dc\u05d4\u05e9\u05e7\u05e2\u05d4 | \u05e0\u05d3\u05dc&quot;\u05df \u05d1\u05d9\u05e0\u05dc\u05d0\u05d5\u05de\u05d9 | \u05d4\u05e9\u05e7\u05e2\u05d5\u05ea \u05e0\u05d3\u05dc&quot;\u05df | \u05de\u05d9\u05de\u05d5\u05df \u05dc\u05d4\u05e9\u05e7\u05e2\u05d5\u05ea \u05e0\u05d3\u05dc&quot;\u05df","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ahuza.co.il\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ahuza.co.il\/en\/#\/schema\/person\/58b028a849147e544c9be4b22602a5da","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c3e3b2bc429d79590065a5d9fd12736718df195224c1c123c8e7f8f5ed23b80f?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/ahuza.sgo.co.il"]}]}},"_links":{"self":[{"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/posts\/5517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/comments?post=5517"}],"version-history":[{"count":3,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/posts\/5517\/revisions"}],"predecessor-version":[{"id":6890,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/posts\/5517\/revisions\/6890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/media\/4312"}],"wp:attachment":[{"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/media?parent=5517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/categories?post=5517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ahuza.co.il\/en\/wp-json\/wp\/v2\/tags?post=5517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}